Where lift jobs usually slip

Four things that cost builders time on a lift job, and how we take each one off your plate.

01

Shafts built to brochure sizes, found wrong at install.

Priced from your plans

Send your drawings for a written price. Each landing door is made to its opening.

02

The lift becomes the last thing holding up handover.

Planned around your program

We tell you what needs to be ready at slab, frame and lock-up. When your shaft passes our checklist, we book the install with you.

03

Gaps between trades that nobody owns.

Who does what, in writing

The split between us, you, your electrician and your client, agreed before anything starts.

04

Working out who looks after the lift once you've handed over.

Looked after long after handover

We service what we sell. Once the job's handed over, your client comes straight to us for anything about the lift, and it's covered by our warranty: 10 years on the structure and 3 years on parts and labour, while the lift is serviced every 12 months.

On your program

Four stages, in the order your build already runs: what we need from you, and when.

  1. 1  Design

    Send us the plans

    We price the lift in writing from your drawings.

  2. 2  Slab and frame

    Build the pit and shaft

    Pit to depth, shaft and openings to the drawings, and power to the isolator before the linings go on.

  3. 3  Fixing

    We install

    Once your shaft passes our checklist, we book the install with you. No wasted site visits.

  4. 4  Handover

    We hand it over

    Tested, commissioned and shown to your client. From then on, they call us.

Before we install

  • Shaft complete, plumb and to the approved dimensions
  • Pit dry, clean and to depth
  • The shaft wall facing the cabin entrance smooth and flush
  • Power ready at the isolator
  • Clear access to every floor

Pass the checklist and we book your install.

Who does what

Agreed in writing before anything starts, so nothing falls between trades.

Rise Lifts

Everything that moves

  • The lift, controls and landing calls, delivered and installed
  • Landing doors made to suit each opening
  • Testing, commissioning and handover
  • Servicing every 12 months after handover, which keeps our warranty active

Builder

Everything it runs in

  • Shaft, pit and openings built to the project drawings
  • Pit waterproofing and drainage
  • Linings and finished floors around each door
  • Permits and third-party approvals, unless we agree otherwise

Electrician

Power supply to an isolator at the power unit.

Owner

A phone line or mobile connection for the cabin phone.

Laser-aligned rail installation inside a home lift shaft

The lift: RISE 300 Series

Design verified to AS/NZS 1735.18:2002, the Australian Standard for passenger lifts in private residences.

  • Hydraulic drive, with the power unit in a nearby cupboard
  • No counterweight in the shaft, no machinery above the ceiling
  • 2 to 5 levels
  • Pit from 150 mm, or 50 mm with a ramp
  • Shaft made to your site, from 800 x 800 mm up to 1400 x 1400 mm
  • Landing doors made to size for each opening
  • In a shaft you build, or a self-supporting glazed structure

Planning figures only. Exact headroom, shaft size and power are set on your drawings. Project drawings govern.

See the RISE 300 Series

What the lift needs

Six dimensions to plan around.

SECTION FIRST FLOOR GROUND FLOOR HEADROOM TRAVEL PIT 3 2 1 PLAN CAR CLEAR OPENING SHAFT WIDTH SHAFT DEPTH 4 5 6
Indicative, not to scale
  1. 1

    Pit. The recess below the lowest floor. 150 mm, or 50 mm with a ramp into the cabin.

  2. 2

    Travel. Floor to floor, from the lowest level served to the highest. 2 to 5 levels.

  3. 3

    Headroom. From the top floor to the underside of the shaft ceiling. Set on your drawings.

  4. 4

    Clear opening. The door's clear width at each landing. Each door is made to size for its opening.

  5. 5

    Shaft width. Inside, wall to wall, across the door side.

  6. 6

    Shaft depth. Inside, from the door wall to the back wall.

Shaft size: every lift is made to your site, from 800 x 800 mm up to 1400 x 1400 mm inside the shaft.

Send us your plans.

Email your drawings with the project suburb and build stage for a written price.

Paying us: a deposit to start drawings, then staged payments through production, delivery, install and handover. All in writing before you commit.